Limited Time 30% Discount Offer Use Code - off30

642-813 Exam Details

642-813 - Bundle Pack

Actualkey Prepration Latest 642-813 : Implementing Cisco IP Switched Networks (SWITCH) Questions and Answers PDF's, Verified Answers via Experts - Pass Your Exam For Sure and instant Downloads - "Money Back Guarantee".


Vendor Cisco
Certification CCNP
Exam Code 642-813
Title Implementing Cisco IP Switched Networks (SWITCH)
No Of Questions 196
Last Updated January 7,2024
Product Type Q & A with Explanation
Bundel Pack Included PDF + Offline / Andriod Testing Engine and Simulator

Bundle Pack

PRICE: $25

642-813 : BUNDLE PACK LEARNING TOOLS INCLUDED

Actualkey Products

PDF Questions & Answers

Exam Code : 642-813 - Jan 7,2024
Testing Engine

Offline Test Engine

Exam Code : 642-813 - Jan 7,2024
Try Demo
android testing engine

Android Test Engine

Exam Code : 642-813 - Jan 7,2024
Try Demo
online Exam Engine

Online Test Engine

Exam Code : 642-813 - Jan 7,2024

642-813 SWITCH
Implementing Cisco IP Switched Networks

Exam Number 642-813 SWITCH
Associated Certifications CCDP and CCNP
Duration 120 minutes (35 - 45 questions)

Implementing Cisco IP Switched Networks (SWITCH 642-813) is a qualifying exam for the Cisco Certified Network Professional CCNP, and Cisco Certified Design Professional CCDP certifications. The SWITCH 642-813 exam will certify that the successful candidate has important knowledge and skills necessary to to plan, configure and verify the implementation of complex enterprise switching solutions using Cisco's Campus Enterprise Architecture. The SWITCH exam also covers secure integration of VLANs, WLANs, voice and video into campus networks.

Exam Topics
The following information provides general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes the guidelines below may change at any time without notice.

Implement VLAN based solution, given a network design and a set of requirements
Determine network resources needed for implementing a VLAN based solution on a network
Create a VLAN based implementation plan
Create a VLAN based verification plan
Configure switch-to-switch connectivity for the VLAN based solution
Configure loop prevention for the VLAN based solution
Configure Access Ports for the VLAN based solution
Verify the VLAN based solution was implemented properly using show and debug commands
Document the verification after implementing a VLAN solution

Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
Determine network resources needed for implementing a Security solution
Create a implementation plan for the Security solution
Create a verification plan for the Security solution
Configure port security features
Configure general switch security features
Configure private VLANs
Configure VACL and PACL
Verify the Security based solution was implemented properly using show and debug commands
Document the verification results after implementing a Security solution

Implement Switch based Layer 3 services, given a network design and a set of requirements
Determine network resources needed for implementing a Switch based Layer 3 solution
Create an implementation plan for the Switch based Layer 3 solution
Create a verification plan for the Switch based Layer 3 solution
Configure routing interfaces
Configure Layer 3 Security
Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
Document the verification results after implementing a Switch based Layer 3 solution

Prepare infrastructure to support advanced services
Implement a Wireless Extension of a Layer 2 solution
Implement a VoIP support solution
Implement video support solution

Implement High Availability, given a network design and a set of requirements
Determine network resources needed for implementing High Availability on a network
Create a High Availability implementation plan
Create a High Availability verification plan
Implement first hop redundancy protocols
Implement switch supervisor redundancy
Verify High Availability solution was implemented properly using show and debug commands
Document results of High Availability implementation and verification
 

 

SATISFIED CUSTOMERS